US Bank Stadium Intel Control Room

This project consisted of a complete build out of both the control and server rooms for Intel Corporation within the US Bank Stadium. The Intel system housed within the server room uses 38 5K ultra-high definition cameras to create enhanced 360-degree highlights. LS Black also managed and oversaw the installation of all of the cameras throughout the stadium. The servers can process up to 1 terabyte of data per 15- to 30-second clip. Volumetric video is fed through miles of fiber-optic cables into the secure control room, where the Intel production team virtually recreates the selected clip in 3D from an ideal vantage point or player’s perspective to take fans directly into the game from angles traditional cameras can’t reach.

Owner
Architect
Location
Minneapolis, MN
Size
400 SF
Value
$695,000
Delivery Method
General Contractor