This $9.4MM design-build project is for the alteration, repair, and upgrade the existing 12,578 SF Army Reserve Center (ARC). Redesign a Personally Owned Vehicle (POV) lot and access road to comply with Anti-Terrorism/Force Protection (AT/FP) guidelines. Repairs will replace aging floors, ceilings, doors, and mechanical/electrical systems with new, modern materials and systems that meet current codes (to include ADA-compliance considerations). The project will modify the building interior to include entrances, exclusive/common administrative offices, classrooms, latrines, lobby area, increased electrical capacity, and other modifications to improve functional efficiency.
The project is scheduled to be complete by August 2023.