University of Minnesota – Cina Hall Upgrades
Core Services Built to Deliver
Owner
University of Minnesota
Location
Duluth, MN
Architect
LHB, Inc
Delivery Method
Design-Bid-Build
Budget
$3,800,000
Results and Client Outcomes
The Cina Hall project, located on the University of Minnesota’s Duluth campus, consisted of the demolition and replacement of the existing fire protection system, plumbing, HVAC and electrical systems to make code compliant. It also included replacing the doors and ceilings. The LS Black team completed extensive remodeling throughout the facility including restrooms and the entire first floor. The first-floor remodel featured glossy black terrazzo flooring, enhanced by bold and brilliantly colored flowers, which were outlined in brass. The floor design was representative of Ojibway bead work.